Convenient Work

11/5/2007:

Here’s some user-submitted photos of work being done right in front of the Dawn Zimmer headquarters at 411 First Street this past weekend, effectively shutting down the street and sidewalk.

One reader had mentioned that workers said they were installing an AT&T cell phone tower there. Others have said that the city has effectively postponed work similar to this near other candidate’s HQ’s in the past.

Was this a “planned” event, or just coincidence?

411-first-st-hoboken-work-2.jpg
411-first-st-hoboken-work.jpg

Leave a Reply

19 Comments on "Convenient Work"

Easy-E
Member

Some of you need to take off the tinfoil hats…

I can’t wait for this to be over.

Biffy B For Mayor
Member
Biffy B For Mayor

[quote comment=”51588″][quote comment=”51579″]OH REALLY?

Not a lot of work happened on Saturday but the street and sidwalks on both sides of the street were blocked all day. I would say the timing was more than “convienent” for Mr.Campos.[/quote]
That street is a dump anyway —- 4th ward blows —– GO 5th Ward!!!!![/quote]
I meant to say…the 6th…i was looking to buy in the 5th…but that wards smells!!!

GO 6th!!!!

🙂

gmac17
Member

the 5th Ward is the lamest Ward – you have to be joking.

Biffy B For Mayor
Member
Biffy B For Mayor

[quote comment=”51579″]OH REALLY?

Not a lot of work happened on Saturday but the street and sidwalks on both sides of the street were blocked all day. I would say the timing was more than “convienent” for Mr.Campos.[/quote]
That street is a dump anyway —- 4th ward blows —– GO 5th Ward!!!!!

westy
Member

OH REALLY?

Not a lot of work happened on Saturday but the street and sidwalks on both sides of the street were blocked all day. I would say the timing was more than “convienent” for Mr.Campos.

wpDiscuz